Ashghal to close part of Salwa Road for building new bridge

  • 2 months   ago
  • 557
Ashghal to close part of Salwa Road for building new bridge

Part of Salwa Road will be close d in one direction by Ashghal, for a distance of around 1.6 km at Rawdat Rashed Interchange. Doha to Bu Samra lanes will be closed starting from Saturday, January 11, 2019. This closure will remain in place for six months.

The traffic will be diverted to the opposite side of the road during this period, which will be partitioned into two lanes for each direction, as shown in the map.

This road   closure aims to enable the construction works of a new bridge at Rawdat Rashed Interchange, as part of Rawdat Rashed Road Development Project implemented by Ashghal. 

 

The project intends to give a developed and safe road to connect Salwa Road with Dukhan Road, and keep the traffic movement away from Rawdat Rashed residential area.

The Public Works Authority will install road signs advising drivers regarding the traffic shift. Ashghal urged all road users to abide by the speed limit, and pursue the street signs to guarantee their wellbeing.

Comments